PREPARATION OF AS BUILT STRUCTURAL DRAWINGS FOR 500 ELEMENTS FOR MNC FMCG PLANT




Power Plant


Challenge:

The challenge in this project was to perform extensive reinforcement mapping on approximately 500 structural elements. The team faced issues related to site accessibility and machinery placement. Furthermore, specific locations had to be altered due to feasibility concerns regarding the installation of ducts, cables, and trays.


Solution:


To address these challenges, the team worked tirelessly, even around the clock. They collaborated with the designer to modify specific locations that were deemed unfeasible for the installation of ducts, cables, and trays. This collaborative effort ensured that the reinforcement mapping could proceed effectively.


Benefits:


The benefit of the team's hard work and collaboration was that they successfully provided the structural consultants with valuable data. This data was crucial for the retrofitting of the structure, ensuring its structural integrity and functionality.