5000sq METER MARINE HERITAGE BUILDING STRUCTURAL AUDIT WITH REMEDIAL MEASURES





Challenge:

Built on an island, this structure was lying unused for decades.


Solution:


In line with plans to restore the structure and make it operational in the near future, detailed as-built architectural and structural drawings were prepared. Based on the projected use, certain areas were recommended for repairs, new addition and removal.


Benefits:


The client could retain a major portion of the structure and optimize the costs associated.